- The Company · Est. 2007
Eighteen years of light
From a single fabrication unit in Sonipat to one of North India’s most trusted window & door manufacturers — Accurate Windoor Solutions has been engineering the seal between people and the sky since 2007.
- About AWS · Chapter 01
We don't make windows. We make light , silence, and scale — possible.
Since 2024, Accurate Windoor Solutions has been a quiet force behind some of India’s most thoughtfully built homes, hospitality landmarks and commercial façades. We engineer windows & doors at the intersection of European precision and Indian climate realism.
A young company, a senior team. Zero compromises on the seal between you and the sky.
- Why AWS · Chapter 03
Built to outlast the building.
Six engineering principles guide every AWS window. They are not features — they are conditions for entry. Anything that fails one test, fails the line.
- 01
Engineered Precision
CNC-cut profiles within ±0.2mm tolerance. Every joint, every weld — measured.
- 02
Acoustic Silence
Up to 42 dB sound reduction with multi-pane laminated glazing.
- 03
Thermal Performance
U-values from 1.1 W/m²K. Lower energy bills, quieter interiors.
- 04
Weather Sealed
EPDM gaskets tested at 250 km/h wind load. Monsoon, sandstorm, salt-air.
- 05
15 / 20 Year Warranty
15-year warranty on Aluminium profiles, 20-year on uPVC profiles. Hardware covered for 5 years on every system.
- 06
Pan-India Service
Direct factory-to-site logistics with dedicated project managers.
- Process · Chapter 04
From site visit to sealed silence.
01
Step 1 of 5
Survey & Site Audit
On-site measurement, structural assessment, and façade analysis — at no cost.
02
Step 2 of 5
Design & Specification
Glass, profile, hardware, and finish curated for your climate, view, and budget.
03
Step 3 of 5
Precision Fabrication
Manufactured at our Sonipat facility under ISO-grade quality controls.
04
Step 4 of 5
Quality Verification
Every unit water-tested, wind-tested, and dry-fitted before dispatch.
05
Step 5 of 5
Installation & Handover
Trained AWS crews — installed in days, sealed for decades.
“Sonipat facility, 2024 — line 03 dispatch ready.”
- Work with us